Industry Safety Alerts
These are industry safety alerts and lessons learned documents issued by companies and regulatory authorities and are published by USAG to assist the industry understand the root cause and contributory factors behind a specific incident.
The documents will address these with lessons learned which may be of benefit to USAG members.
The documents were not reviewed or approved by USAG but they are publically available or we do have permission from the owner for publication to improve industry standards and reduce the number of strikes.
Unidentified Low Voltage Cable Cut With Hand Tool
This safety bulletin concerns a low voltage cable that was not identified and was inside a pipe believed to be water. Due to other positively identified water pipes in the vicinity it was assumed that the pipe containing the cable was also water. Upon cutting the pipe there was a pop and puff of black smoke as the worker cut and damaged the cable. Fotunately the worker was not injured in this case but had the conditions been unfavorable this could have resulted in an injury or fatal.
This bulletin shows the importance of positive identification and the danger of making assumptions of which type of services are within your worksite once they have been exposed. With thanks to Thames Water for making this available for others to learn from.
This bulletin shows the importance of positive identification and the danger of making assumptions of which type of services are within your worksite once they have been exposed. With thanks to Thames Water for making this available for others to learn from.

lv_strike_-_learning_bulletin.pdf | |
File Size: | 163 kb |
File Type: |
Undetected Low Voltage Cable Strike
This safety alert is regarding damage to a low voltage cable on a work site being excavated to investigate for the presence of asbestos. It is an interesting investigation showing the difficulties experienced in detecting the cable with other metallic objects in close proximity. In this case using the genny to clamp on to a nearby pump would likely have increased the ability to detect the cable.
With thanks to Thames Water for making this available for others to learn from.
With thanks to Thames Water for making this available for others to learn from.

safety_alert_-_lv_service_strike.pdf | |
File Size: | 717 kb |
File Type: |
300mm Water Main Strike
This incident involves damage to a 300mm water main whilst installing new drainage assets. The damage occurred to the pipe even though it was known to be in the vicinity of the excavation and marked up.
The report identifies that permit to dig conditions of not to mechanically excavate within 500mm of a service and also to physically Identify using trial holes, in this case there had already been a vacuum excavation rig onsite to identify services. Here we see the importance of having a permit to dig process but importantly having the controls in place to ensure that the permit is adhered to.
Please download for full details of the report and our thanks to Osborne Construction for making this report available for the benefit to all.
The report identifies that permit to dig conditions of not to mechanically excavate within 500mm of a service and also to physically Identify using trial holes, in this case there had already been a vacuum excavation rig onsite to identify services. Here we see the importance of having a permit to dig process but importantly having the controls in place to ensure that the permit is adhered to.
Please download for full details of the report and our thanks to Osborne Construction for making this report available for the benefit to all.

300mm_water_main_strike.pdf | |
File Size: | 406 kb |
File Type: |
11kV Cable Strike while concrete breaking
With thanks to Highways England for sharing this incident report. This incident involves an operative using a jackhammer to break concrete striking and damaging an 11kV electricity distribution cable. An arc flash occurred with the operative experiencing minor burns with damage to his PPE trousers and and the breaker chisel was damaged. The photograph of the damaged chisel shows just how powerful a strike of this nature can be and the operative was fortunate to have more serious injuries and shows the importance of PPE at the same time.
The incident report indicates this cable was found buried shallow and encased in concrete with the provisional findings showing that inadequete survey practices taking place to confim the depth and postion of the cable.
The incident report indicates this cable was found buried shallow and encased in concrete with the provisional findings showing that inadequete survey practices taking place to confim the depth and postion of the cable.

highways_england_11kv_service_strike.pdf | |
File Size: | 421 kb |
File Type: |
Water Service Pipe Left Exposed in Ditch
This is more of an example of what is likely to happen to a pipe or cable if is installed in a non compliant way.
The pipe was not mapped and was not picked up through traditional survey methods and was exposed as it crossed the drainage ditch. A pipe installed in this way was almost always going to have a destiny with being damaged as the ditch was cleared and could have been much worse if it was gas or power. One for the files of how not to do things when installing a cable or pipe. Don't leave a problem for someone else to find and deal with further down the line.
The pipe was not mapped and was not picked up through traditional survey methods and was exposed as it crossed the drainage ditch. A pipe installed in this way was almost always going to have a destiny with being damaged as the ditch was cleared and could have been much worse if it was gas or power. One for the files of how not to do things when installing a cable or pipe. Don't leave a problem for someone else to find and deal with further down the line.

a47_water_supply_damage.pdf | |
File Size: | 298 kb |
File Type: |
Damaged Streetlighting Cable
Whilst undertaking trial holes to enable connections of two known power cables in the area, an operative using insulated hand tools came into contact with a low voltage street lighting cable, damaging the outer sheath of the cable.
A number of different issues have been highlighted in this report and in particular was the use of the CAT (Cable Avoidance Tool) not being used in conjunction with the GENNY 'Signal Generator'. The GENNY is key to detecting some types anf cables and in particular deenergised streetlight cables during the day.
A number of different issues have been highlighted in this report and in particular was the use of the CAT (Cable Avoidance Tool) not being used in conjunction with the GENNY 'Signal Generator'. The GENNY is key to detecting some types anf cables and in particular deenergised streetlight cables during the day.

safety_alert_-_damaged_street_lighting_cable.pdf | |
File Size: | 376 kb |
File Type: |
High Pressure Gas Main Strike - Upper Thames Crossing
This safety alert is with thanks to Highways England regarding a strike to a high pressure gas main during works for trial pits/boreholes.
There are some of the more usual process failures when it came to use of cable and pipe detection equipment and visual assessment of the site. But it raises some important points about design work to ensure there are no conflicts with already present cables and pipes. Also procedures around the electronic device storage and use of design data and ensuring it's validity for the works about to be undertaken.
With more and more designs, permits and approvals taking place electronically on devices at the worksite this shows a really good excample of what can happen should a controlled process not be fully in place.
Thankfully the strike did not rupture the pipe in this incident and it is with thanks that this learning document has been shared for the greater good of the industry.
There are some of the more usual process failures when it came to use of cable and pipe detection equipment and visual assessment of the site. But it raises some important points about design work to ensure there are no conflicts with already present cables and pipes. Also procedures around the electronic device storage and use of design data and ensuring it's validity for the works about to be undertaken.
With more and more designs, permits and approvals taking place electronically on devices at the worksite this shows a really good excample of what can happen should a controlled process not be fully in place.
Thankfully the strike did not rupture the pipe in this incident and it is with thanks that this learning document has been shared for the greater good of the industry.

highways_england_-_high_pressure_gas_main_strike.pdf | |
File Size: | 319 kb |
File Type: |
Mobile Concrete/Crane Collapse & Injury Dec 2020
Mobile cranes and concrete pumps.
Usually the most common cause of incidents with this equipment are risks associated with lifting and contact with overhead electricity lines.
However as you can see from this incident overseas you also need to take account of the ground on which you set up and deploy the outriggers/supports to lift heavy loads. Be aware of any underground pipes and cables and do not place the outriggers/supports over these services. Undue pressue from heavy loads being lifted can cause damage to underground utility pipes and cables.
In the case of this incident underground pipes were damaged during lifting causing ground subsidence and the vehicle and load became unbalanced and tipped over. The operator was pinned causing leg injuries. When planning lifting or concrete pour operations from mobile plant ensure that your pre planning and safe systems of work include checking for the presence of underground as well as overhead services at your lifting site. Please share this around to any of your colleagues or operations the deal in the design, planning and execution of works where vehicles of this type are used.
Usually the most common cause of incidents with this equipment are risks associated with lifting and contact with overhead electricity lines.
However as you can see from this incident overseas you also need to take account of the ground on which you set up and deploy the outriggers/supports to lift heavy loads. Be aware of any underground pipes and cables and do not place the outriggers/supports over these services. Undue pressue from heavy loads being lifted can cause damage to underground utility pipes and cables.
In the case of this incident underground pipes were damaged during lifting causing ground subsidence and the vehicle and load became unbalanced and tipped over. The operator was pinned causing leg injuries. When planning lifting or concrete pour operations from mobile plant ensure that your pre planning and safe systems of work include checking for the presence of underground as well as overhead services at your lifting site. Please share this around to any of your colleagues or operations the deal in the design, planning and execution of works where vehicles of this type are used.

collapse_of_concrete_truck_due_to_damaged_ug_pipe_-_australia.pdf | |
File Size: | 1399 kb |
File Type: |
Supporting LV to 33kV Cables - Case Studies and Guidance, SP Energy Networks - Dec 2020
Here are some case studies and a useful guide document on how to support exposed LV to 33kV cables spanning your excavation, supplied by SP Energy Networks

supporting_cables_case_studies___guide.pdf | |
File Size: | 2215 kb |
File Type: |
Gas and Electric Service Strikes - May to Aug 2020, M40 Improvement Works
In May of 2020, a 20mm gas pipe and a low-voltage electric cable were struck in Wardington and on the M40 J11 improvement works respectively. In August 2020, another low-voltage electric cable was struck on the M40 J11 improvement works.

gas_and_electric_service_strikes_-_shared_learning_-_29.09.2020.pdf | |
File Size: | 88 kb |
File Type: |
'A Striking Reminder' Excavator Contact With 11kV Overhead Lines - September 2020
During river maintenance work a 21 tonne long reach excavator fitted with a weed cutting attachment, came into contact with an uninsulated overhead electricity cable rated at 11000 Volts. Fortunately no one was injured and the utility company repaired the damaged cable that day. With thanks to the Environment Agency for making this report available.

environment_agency_safety_alert_-_a_striking_reminder.pdf | |
File Size: | 149 kb |
File Type: |
Surface Cable Damage by Mower - April 2020
In April 2020 a low voltage electricalcable was damaged during a mowing operation at the Barley Mow junction of the A43/A421. With thanks to Amey for sharing this incident report.

surface_cable_strike_april_2020.pdf | |
File Size: | 228 kb |
File Type: |
Flooding caused by thrust block removal - September 2020
Concrete blocks incorrectly identified as waste materials and removed during excavations, resulting in flooding due to failed watermain. Alert with thanks to Highways England.

hei184_-_highways_england_for_information_safety_alert_-_water_main_release_-_thrust_block__1_.pdf | |
File Size: | 371 kb |
File Type: |
Strike to Low Voltage Cable - New Build Housing With Embedded Network - Leicester, June 2020
Cable strike to a low voltage distribution network damaged by a third party at Hamilton, Leicestershire resulted in a power outage to residents. This network was installed and owned by another company GTC and is a low voltage distribution network embedded within the wider network footprint of Western Power Distribution.
USAG recommends if you are working in a relativley new build area you should check plans for the presence of low voltage network where there should be. Below is a copy of the plan for this location and you can see missing low voltage schematics from the plan on the eastern edge where new homes are built and occupied. If you come across this situation you should check for further asset owners. The usual distribution network owner for the area should be able to help you identify the network owner if there are no above ground markings or signage on substations.
USAG recommends if you are working in a relativley new build area you should check plans for the presence of low voltage network where there should be. Below is a copy of the plan for this location and you can see missing low voltage schematics from the plan on the eastern edge where new homes are built and occupied. If you come across this situation you should check for further asset owners. The usual distribution network owner for the area should be able to help you identify the network owner if there are no above ground markings or signage on substations.
Damage To Cables - Encased in Concrete - London - June 2020
See attached incident notification for an incident of damage to cables that had been embedded in a concrete block that was being removed from the ground.

national_grid_-_damage_to_underground_service_-_concrete_block_-_june_2020.pdf | |
File Size: | 237 kb |
File Type: |
Malicious 5G poster/stickers - Sharps Risk attached to Electricity/Telco/Street Furniture - National
See attached bulletin supplied by Highways England relating to 5G protest posters and stickers left on electricity cabinets, poles, telco equipment that some of our members might encounter during their work. These may have blades and needles behind them intended to injure.
Please share and distribute to raise awareness of this issue
Please share and distribute to raise awareness of this issue

safety_alert_-_5g_protest_posters_-_sharps_risk.pdf | |
File Size: | 383 kb |
File Type: |
National Grid Peterborough - Excavating Within 3 Metres of Live Asset - March 2020
National Grid project for compressor upgrade where a breach of permit conditions by a subcontractor led to an increased risk of damage to a high pressure gas pipeline on the site.

national_grid_-_slb_-_excavating_within_3m_of_live_asset.pdf | |
File Size: | 189 kb |
File Type: |
University of Birmingham - National Buried Infrastructure Facility - Fall From Height Fatality - January 2020
This incident highlights the need for coordination between different contractors and activities on the same worksite.

safety_alert_-_fatality_national_buried_infrastructure_facility_fall_from_heigh.pdf | |
File Size: | 173 kb |
File Type: |
Milton Keynes Gas Strike and Iginition - November 2019

safety_alert_-_ignition_of_gas_service_following_a_strike.pdf | |
File Size: | 1007 kb |
File Type: |
Surface Collapse from Void created by Water Leak - October 2019

voids191017.pdf | |
File Size: | 371 kb |
File Type: |
Removal of PPE in Active Work Zone - Burn Injury from LV Cable Failure - October 2019

ssen_-_she_communication_-_low_voltage_flash_-_oct_2019__003_.pdf | |
File Size: | 243 kb |
File Type: |
32mm PE Gas Main Damage - September 2019

lmjv_-_welsh_rd_-_gas_service_-05-09-19__002_.pdf | |
File Size: | 422 kb |
File Type: |
11kV Strike with Auger - July 2019

hsbn99-incident-learning-11kvcable-strike.pdf | |
File Size: | 301 kb |
File Type: |
Ingrebourne Valley - 415V Strike July 2019

415v_ingrebourne_valley_415v_cable_strike_safety_alert.pdf | |
File Size: | 461 kb |
File Type: |
Earlston - 11kV Strike July 2019

safety_alert_earlston_11kv_strike.pdf | |
File Size: | 191 kb |
File Type: |
Case Study - Electrical Cable inside Gas Ducting

case_study_-_electricity_cable_inside_gas_ducting.pdf | |
File Size: | 193 kb |
File Type: |
Sellafield - 132kV Cable Strike, 2018

sellafield_-_cable_strike_-_2018.pdf | |
File Size: | 1536 kb |
File Type: |
Mullingar, Co. Westmeath - 10kV Cable Strike, March 2019

10kv_esb_cable_strike_-_mullingar_co._westmeath.pdf | |
File Size: | 316 kb |
File Type: |
Learning Alert - Water Pipe Identification - May 2019

shared_learning_-_buried_services_-_may_2019.pdf | |
File Size: | 219 kb |
File Type: |
Permit to Excavate Completed Incorrectly - May 2019

permit_to_work_completed_incorrectly.pdf | |
File Size: | 760 kb |
File Type: |
York - 11kV Cable Strike, November 2018

safety-bulletin-nrb-18_18-11kv-depot-cable-strike.pdf | |
File Size: | 95 kb |
File Type: |
Positive Intervention - Cable Encased In Concrete

october_positive_interventions_poster_-_v2__1_.pdf | |
File Size: | 347 kb |
File Type: |
Wisbech - 11kV Cable Joint Explosion - Feb 2018

safety_alert_18-14_hv_cable_joint_explosion.pdf | |
File Size: | 264 kb |
File Type: |
London - 11kV Flashover Explosion, May 2018

safety-moment-_may-2018_.pdf | |
File Size: | 782 kb |
File Type: |